New Homes » Kanto » Kanagawa Prefecture » Atsugi


Atsugi City, Kanagawa Prefecture
Odawara Line Odakyu "Hon-Atsugi" 12 minutes Renshoji step 3 minutes by bus
Every weekend is a local sales meetings being conducted. Good day in the southeast corner lot. LDK16.5 Pledge, Of course, car space is two!
Corresponding to the flat-35S, Parking two Allowed, System kitchen, A quiet residential area, LDK15 tatami mats or more, Corner lotese-style room, Shaping land, Washbasin with shower, Face-to-face kitchen, Toilet 2 places, 2-story, Southeast direction, South balcony, Warm water washing toilet seat, Underfloor Storage, Water filter, Flat terrain, Zenshitsuminami direction
Features pickup
Corresponding to the flat-35S / Parking two Allowed / System kitchen / A quiet residential area / LDK15 tatami mats or more / Corner lot / Japanese-style room / Shaping land / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / 2-story / Southeast direction / South balcony / Warm water washing toilet seat / Underfloor Storage / Water filter / Flat terrain / All rooms facing southeast
Event information
Local sales meeting schedule / Every Saturday, Sunday and public holidays time / 10:00 ~ 17:00
Property name
Libre Garden Atsugi Nakaechi fifth
Price
26,800,000 yen
Floor plan
4LDK
Units sold
1 units
Total units
1 units
Land area
116.25 sq m (registration)
Building area
105.16 sq m (registration)
Driveway burden-road
Nothing, South 4m width, East 4.4m width
Completion date
December 2013
Address
Atsugi City, Kanagawa Prefecture Nakaechi 19-5
Traffic
Odawara Line Odakyu "Hon-Atsugi" 12 minutes Renshoji step 3 minutes by bus
Related links
[Related Sites of this company]
Person in charge
[Regarding this property.] Southeast corner lot ・ Parking 2 cars ・ Is 4LDK. Please feel free to contact us.
Contact
TEL: 0800-805-6461 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
60% ・ 200%
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Other limitations
Regulations have by the Landscape Act
Overview and notices
Facilities: Public Water Supply, This sewage, Individual LPG, Building confirmation number: the H building certification KBI04064, Parking: car space
Company profile
<Marketing alliance (agency)> Governor of Kanagawa Prefecture (4) The 022,018 Gominami Takeshi Construction (Ltd.) Yubinbango243-0014 Atsugi City, Kanagawa Prefecture Asahimachi 5-46-17


Local guide map

Local guide map. Please come to the local 1.
Please come to the local 1.

Rendering (appearance)
Rendering (appearance)

Floor plan

Floor plan. 26,800,000 yen, 4LDK, Land area 116.25 sq m , Building area 105.16 sq m
26,800,000 yen, 4LDK, Land area 116.25 sq m , Building area 105.16 sq m

Compartment figure

Compartment figure. 26,800,000 yen, 4LDK, Land area 116.25 sq m , Building area 105.16 sq m
26,800,000 yen, 4LDK, Land area 116.25 sq m , Building area 105.16 sq m

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Standard adopted "rebar-filled concrete mat foundation" to the foundation in this property. The base portion is Haisuji the 13mm rebar in a grid pattern in 200mm pitch, It made by pouring concrete. Because solid foundation to cover the basis of the whole ground, It can be transmitted to the ground by dispersing a load of the building, It is possible to improve the durability and earthquake resistance against immobility subsidence. or, Because under the floor over the entire surface is concrete will also be moisture-proof measures.
Standard adopted "rebar-filled concrete mat foundation" to the foundation in this property. The base portion is Haisuji the 13mm rebar in a grid pattern in 200mm pitch, It made by pouring concrete. Because solid foundation to cover the basis of the whole ground, It can be transmitted to the ground by dispersing a load of the building, It is possible to improve the durability and earthquake resistance against immobility subsidence. or, Because under the floor over the entire surface is concrete will also be moisture-proof measures.

Other Equipment

Other Equipment. Design with a sophisticated and stylish design design and ease of use
Design with a sophisticated and stylish design design and ease of use

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Clean air 24-hour ventilation system which performs plan to the discharge of the supply air and dirty air. By moisture easily accumulate room also forced ventilation at all times, It is also effective in the suppression of condensation and mold.
Clean air 24-hour ventilation system which performs plan to the discharge of the supply air and dirty air. By moisture easily accumulate room also forced ventilation at all times, It is also effective in the suppression of condensation and mold.

Other Equipment

Other Equipment.  ・ Smart counter of the apron and back guard shape ・ Handle of aluminum line and refreshing ・ In flat until the feet, Silver stocker of design that was clean
・ Smart counter of the apron and back guard shape ・ Handle of aluminum line and refreshing ・ In flat until the feet, Silver stocker of design that was clean

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Adopt a "seismic hardware" is at the junction anchoring the structure material. Foundation ・ Foundation ・ Select the right man in the right place seismic hardware for each joint, such as pillars, Firmly Tightened the structure. Prevent the building of distortion and collapse from the shaking caused by an earthquake, It has extended the durability of the whole house.
Adopt a "seismic hardware" is at the junction anchoring the structure material. Foundation ・ Foundation ・ Select the right man in the right place seismic hardware for each joint, such as pillars, Firmly Tightened the structure. Prevent the building of distortion and collapse from the shaking caused by an earthquake, It has extended the durability of the whole house.

Other Equipment

Other Equipment. Single-sided grill ・ Outer flame formula. Width 600 millimeters. Sensor was mounted to all of the crater, "Cooking oil overheating prevention device", "Extinction safety device", Three of the safety function of the "forgetting to turn off fire function" has been standard equipment.
Single-sided grill ・ Outer flame formula. Width 600 millimeters. Sensor was mounted to all of the crater, "Cooking oil overheating prevention device", "Extinction safety device", Three of the safety function of the "forgetting to turn off fire function" has been standard equipment.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In this listing is, First floor and the thickness on the second floor of the floor was to select "Tsuyoshiyuka method" to lay the 24mm of plywood. This is a method that Tsukeru fastened directly to the foundation and beam structure for the surface material, By integrating the whole house the floor as one of the plane, It will be a very strong structure in force from the horizontal. To prevent twisting of the house, It provides excellent effect on earthquake resistance.
In this listing is, First floor and the thickness on the second floor of the floor was to select "Tsuyoshiyuka method" to lay the 24mm of plywood. This is a method that Tsukeru fastened directly to the foundation and beam structure for the surface material, By integrating the whole house the floor as one of the plane, It will be a very strong structure in force from the horizontal. To prevent twisting of the house, It provides excellent effect on earthquake resistance.

Other Equipment

Other Equipment.  ・ Do not use a heater, Mirror that does not fog over the entire surface → electric bill zero, Worry of forgetting to turn off is also unnecessary ・ Hard to break artificial marble ball ・ Stylish tray, such as cosmetic accessories is definitive ・ Single-lever shower → 60 mm of lift up, It can be switched between a shower and a water conditioner ・ A handle with door of wide type
・ Do not use a heater, Mirror that does not fog over the entire surface → electric bill zero, Worry of forgetting to turn off is also unnecessary ・ Hard to break artificial marble ball ・ Stylish tray, such as cosmetic accessories is definitive ・ Single-lever shower → 60 mm of lift up, It can be switched between a shower and a water conditioner ・ A handle with door of wide type

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In this listing is, Using a ceramic system of siding on the outer wall finish, Has adopted the "outer wall ventilation method" in which a ventilation space between the wall and the outer wall coverings. This, The moisture of the wall inside the body can be efficiently released into the outside air, To suppress the internal condensation, You can improve the durability. In the summer, The ventilation of the air layer, You can also expect the thermal barrier effect.
In this listing is, Using a ceramic system of siding on the outer wall finish, Has adopted the "outer wall ventilation method" in which a ventilation space between the wall and the outer wall coverings. This, The moisture of the wall inside the body can be efficiently released into the outside air, To suppress the internal condensation, You can improve the durability. In the summer, The ventilation of the air layer, You can also expect the thermal barrier effect.

Other Equipment

Other Equipment.  ・ Es line tub of spacious shape → sitz bath and parent and child bathing also relaxed. Easy to sit on the edge, Ease out ・ Easy to dry, Adopt a non-slip Flagstone floor. Cleaning is also easy to ・ Is a tub of hard insulation specifications escape the heat. Number of times reheating also to reduce and you can save energy costs
・ Es line tub of spacious shape → sitz bath and parent and child bathing also relaxed. Easy to sit on the edge, Ease out ・ Easy to dry, Adopt a non-slip Flagstone floor. Cleaning is also easy to ・ Is a tub of hard insulation specifications escape the heat. Number of times reheating also to reduce and you can save energy costs

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. To prevent the deterioration of the building, It is important the elimination of under the floor of the moisture that causes corrosion of the structural part.
To prevent the deterioration of the building, It is important the elimination of under the floor of the moisture that causes corrosion of the structural part.

Other Equipment

Other Equipment.  ・ Borderless shape in consideration of the cleaning ease ・ Tornado cleaning to wash all over the inside of the toilet bowl in the double of water flow ・ The pottery surface was coated in slippery at the nano-level "Sefi on Detect" toilet bowl ・ Automatically from "deodorizing", Deodorizing in cooperation switches to suction weight of about 2 times the "power deodorizing"
・ Borderless shape in consideration of the cleaning ease ・ Tornado cleaning to wash all over the inside of the toilet bowl in the double of water flow ・ The pottery surface was coated in slippery at the nano-level "Sefi on Detect" toilet bowl ・ Automatically from "deodorizing", Deodorizing in cooperation switches to suction weight of about 2 times the "power deodorizing"

Primary school

Primary school. 1450m
1450m

Junior high school

Junior high school. 1120m
1120m



Location