New Homes » Kansai » Osaka prefecture » Naka-ku, Sakai City


Osaka FuSakai City Naka-ku,
Senboku high-speed rail "Izumigaoka" walk 18 minutes
◆ Local tours ・ Mortgage briefing held in! ◆ Down payment $ 0, Full loan possible! ◆ Our day, seven days a week! Night tour Allowed until 9:00! Come any time Otsutome way home, Please visit!
Since it is widely and 6.7m the road is wide open and the development within the subdivision between the adjacent land will feel the peace of the entire 43 compartment. There is a park in the subdivision, Pleasing of small children playground. In addition to school because the elementary school is also located in close is safe. Fukai ・ Izumigaoka Line bus stop a 2-minute walk. ■ Berurando General Hospital: 8 minutes walk ■ FamilyMart: walk 11 minutes ■ Savoy taste road Museum Izumigaoka shop: 14 mins
Features pickup
Eco-point target housing / Measures to conserve energy / Pre-ground survey / Parking two Allowed / Immediate Available / 2 along the line more accessible / Energy-saving water heaters / It is close to golf course / Super close / It is close to the city / System kitchen / Yang per good / All room storage / A quiet residential area / LDK15 tatami mats or more / Around traffic fewer / Or more before road 6m / Japanese-style room / Shaping land / Idyll / Washbasin with shower / Face-to-face kitchen / Barrier-free / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / Double-glazing / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / Leafy residential area / Urban neighborhood / Ventilation good / All living room flooring / Good view / Dish washing dryer / All room 6 tatami mats or more / Water filter / All rooms are two-sided lighting / A large gap between the neighboring house / In a large town / Development subdivision in / Readjustment land within
Event information
Local tours (Please be sure to ask in advance) schedule / Every Saturday, Sunday and public holidays time / 10:00 ~ 17:00 seller nor architecture also Makoto group sales [Ask me for many surrounding environment] Anytime you visit OK! Seller ・ Architecture ・ Makoto group all 43 sections of the comprehensive real estate company sales Site more than 36 square meters! Parking 3 units can be. Immediate Available!
Price
22,800,000 yen
Floor plan
4LDK
Units sold
1 units
Land area
140.63 sq m (42.54 tsubo) (Registration)
Building area
93.15 sq m (28.17 tsubo) (Registration)
Driveway burden-road
Nothing, West 6.7m width
Completion date
July 2013
Address
Osaka FuSakai City Naka-ku, rural
Traffic
Senboku high-speed rail "Izumigaoka" walk 18 minutes
Senboku high-speed rail "deep" walk 19 minutes
Subway Midosuji Line "Nakamozu" walk 35 minutes
Related links
[Related Sites of this company]
Person in charge
Rep Kubota HiroshiTakeshi
Contact
(Corporation) Makoto Corporation Real Estate Information Center TEL: 0800-603-3143 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
60% ・ Hundred percent
Time residents
Immediate available
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
Urbanization control area
Overview and notices
Contact: Kubota HiroshiTakeshi, Facilities: Public Water Supply, This sewage, City gas, Building Permits reason: land sale by the development permit, etc., Parking: car space
Company profile
<Mediation> governor of Osaka (2) No. 049170 (Corporation) Makoto Corporation Real Estate Information Center Yubinbango591-8044 Sakai-shi, Osaka, Kita-ku, Nakanagao cho 4-5-21


Same specifications photos (appearance)

Same specifications photos (appearance). AsahiKASEI POWER BOARD ● fire protection ● thermal insulation properties lineup the fire insurance premium reduction personality full of texture ●. You can freely express the look of the facade, It plays a major role in harmony with the heavy feeling and modern impression making landscape.
AsahiKASEI POWER BOARD ● fire protection ● thermal insulation properties lineup the fire insurance premium reduction personality full of texture ●. You can freely express the look of the facade, It plays a major role in harmony with the heavy feeling and modern impression making landscape.

Same specifications photos (living)

Same specifications photos (living). Breadth of living also because 16 tatami mats or more we are spacious without feeling a narrow be arranged the furniture of.
Breadth of living also because 16 tatami mats or more we are spacious without feeling a narrow be arranged the furniture of.

Same specifications photo (kitchen)

Same specifications photo (kitchen). Cleanup Corporation CREAN LADY A kitchen that could not be recycled in a wooden cabinet by the "eco cabinet" made of stainless steel Cleanup will contribute to the global environment. Quality to the part which is not visible stainless. So, Cleanliness, Long life, Eco
Cleanup Corporation CREAN LADY A kitchen that could not be recycled in a wooden cabinet by the "eco cabinet" made of stainless steel Cleanup will contribute to the global environment. Quality to the part which is not visible stainless. So, Cleanliness, Long life, Eco

Floor plan

Floor plan. 22,800,000 yen, 4LDK, Land area 140.63 sq m , Garage there is a building area of ​​93.15 sq m all sections 36 square meters or more of the site is also spacious compartment, such as three possible.
22,800,000 yen, 4LDK, Land area 140.63 sq m , Garage there is a building area of ​​93.15 sq m all sections 36 square meters or more of the site is also spacious compartment, such as three possible.

Same specifications photo (bathroom)

Same specifications photo (bathroom). Panasonic Kokochino B class Bathtub as well as, The floor is also a heat insulating material adoption, Do not miss the heat from anywhere in the bathroom. Play a role in energy conservation! ! ● floor insulation specification ● warm tub ● swish swish and clean water outlet ● beautiful followed "Sugopika material"
Panasonic Kokochino B class Bathtub as well as, The floor is also a heat insulating material adoption, Do not miss the heat from anywhere in the bathroom. Play a role in energy conservation! ! ● floor insulation specification ● warm tub ● swish swish and clean water outlet ● beautiful followed "Sugopika material"

Same specifications photos (Other introspection)

Same specifications photos (Other introspection). The Japanese-style room is convenient to the tone of the blindfold and the light from the outside on the mounting a sliding door in the standard equipment.
The Japanese-style room is convenient to the tone of the blindfold and the light from the outside on the mounting a sliding door in the standard equipment.

Wash basin, toilet

Wash basin, toilet. Panasonic W = 900
Panasonic W = 900

Toilet

Toilet. TOTO
TOTO

Other

Other. Sometimes more will further enhance the atmosphere of the house out a profound feeling that to tiling around the front door.
Sometimes more will further enhance the atmosphere of the house out a profound feeling that to tiling around the front door.

Other. Directed the pomp of brightness and looks at the entrance hall of the marble has to produce a welcome at Good residential.
Directed the pomp of brightness and looks at the entrance hall of the marble has to produce a welcome at Good residential.

Supermarket

Supermarket. Savoy 1051m to taste the road Museum Izumigaoka shop
Savoy 1051m to taste the road Museum Izumigaoka shop

Kindergarten ・ Nursery

kindergarten ・ Nursery. 240m through the current year nursery school to
240m through the current year nursery school to

Primary school

Primary school. Sakai Tatsunishi pottery up to elementary school 640m
Sakai Tatsunishi pottery up to elementary school 640m

Convenience store

Convenience store. 830m to FamilyMart
830m to FamilyMart

Hospital

Hospital. Berurando 880m to General Hospital
Berurando 880m to General Hospital

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In also with regard to rebar that becomes a framework of basic Corporation, Although it has a diameter of 1 centimeter of rebar to be arranged in a 30 centimeter interval, We are a 20 centimeter interval diameter 1.3 cm of rebar, The diameter of the rebar is large arrangement interval will work in close, Also has to be a strong foundation than Corporation specifications 1.3 centimeters of rebar as a two by two each for the rebar to support the head and the bottom (see our Specifications Figure). This 2-story, 3 has been adopted as our basic standard specifications regardless of the story.
In also with regard to rebar that becomes a framework of basic Corporation, Although it has a diameter of 1 centimeter of rebar to be arranged in a 30 centimeter interval, We are a 20 centimeter interval diameter 1.3 cm of rebar, The diameter of the rebar is large arrangement interval will work in close, Also has to be a strong foundation than Corporation specifications 1.3 centimeters of rebar as a two by two each for the rebar to support the head and the bottom (see our Specifications Figure). This 2-story, 3 has been adopted as our basic standard specifications regardless of the story.

Construction ・ Construction method ・ specification. General cloth foundation has weak weakness to differential settlement. Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises. Shape is the same as the basic shape, which has been adopted by the Corporation, but the bottom panel with a thickness of 3 cm, In embedment of the outer periphery (depth to be embedded in the ground) will not exceed 6 cm.
General cloth foundation has weak weakness to differential settlement. Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises. Shape is the same as the basic shape, which has been adopted by the Corporation, but the bottom panel with a thickness of 3 cm, In embedment of the outer periphery (depth to be embedded in the ground) will not exceed 6 cm.

Construction ・ Construction method ・ specification. Joint force is to focus on, such as during an earthquake (foundation and pillar, Use the seismic hardware to the pillars and beams, etc.).
Joint force is to focus on, such as during an earthquake (foundation and pillar, Use the seismic hardware to the pillars and beams, etc.).

Construction ・ Construction method ・ specification. Formerly a joist construction method (1 × floor magnification), Through the joist-less method (floor magnification 1.2 times), It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. The evolution to the direction in which the structure is strongly we give priority to safety.
Formerly a joist construction method (1 × floor magnification), Through the joist-less method (floor magnification 1.2 times), It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. The evolution to the direction in which the structure is strongly we give priority to safety.

Construction ・ Construction method ・ specification. The framework and the axis of pairs of coupled construction method that structural plywood to be used in load-bearing wall and (JAS standard product) was used both the brace to be used in the conventional method of construction in the 2 × 4 construction method to all outer wall, It has a structure to a more stubborn.
The framework and the axis of pairs of coupled construction method that structural plywood to be used in load-bearing wall and (JAS standard product) was used both the brace to be used in the conventional method of construction in the 2 × 4 construction method to all outer wall, It has a structure to a more stubborn.

Construction ・ Construction method ・ specification. Pillar is contained in the interval of basic 90cm (2 times that of conventional). Liang is using a larger with a margin rather than the structural calculation the last minute. That all of the columns and beams is using the engineering Wood.
Pillar is contained in the interval of basic 90cm (2 times that of conventional). Liang is using a larger with a margin rather than the structural calculation the last minute. That all of the columns and beams is using the engineering Wood.



Location